BIM Scope of Work


via IFTTT https://youtu.be/abBAWgidwdg تاكد انك مشترك في القناة 💯 ومفعل الجرس عشان يوصلك كل جديد 🔔 وما تنساش تعمل لايك للفيديو 👍 BIM Scope of Work   Table of Contents 1. General 4 1.1. Introduction 4 1.2. Statement of Purpose 4 1.3. Tender submission requirements 4 1.4. IT infrastructure 4 1.5. BIM Ownership and Reuse 5 1.6. Responsibility for BIM review (model review (for approval) by *****) 5 1.7. Change Management 5 1.8. Relationship of BIM Requirements to other Requirements 5 2. BIM USES 6 2.1. Clash Detection and Conflict Resolution 6 2.2. Scheduling (4D) 7 2.3. Record BIM 7 2.4. Facility Management 7 3. BIM EXECUTION PLAN (BEP) 8 3.1. BIM Staffing Plan 8 3.2. Model Progression and LOD Matrices 9 3.3. BIM Process Design 9 3.4. Schedule of deliverables 9 3.5. Model Structure 9 3.5.1. File Naming Structure 9 3.5.2. Model Structure and Division of Modelled Information 9 3.5.3. Measurement and Coordinate Systems 10 3.6. Software and Operating Systems 10 3.7. Electronic Communication Procedures 10 3.7.1. File Access and Archiving 10 3.7.2. Electronic file formats and use 10 3.8. Change Management 10 3.9. Construction Management 10 3.10. Facility Management 11 4. INTEROPERABILITY 11 4.1. BIM Software 11 4.2. Open Source File Formats/Open Standards 12 5. MODELING REQUIREMENTS 12 5.1. General 12 5.2. Drawings 13 5.3. Model Geographical Location 13 5.4. Requirements for Modeling Space 14 5.5. Contractor BIM Deliverables 14 5.5.1. Models 14 5.5.2. BIM-FM database 14 5.5.3. Digital Deliverables 14   1. General 1.1. Introduction This document defines the Contractor‘s scope of work and deliverables for using Building Information Modeling (BIM). The Contractor’s response should include the below tasks and deliverables within its proposal. 1.2. Statement of Purpose If used effectively, BIM provides opportunities to improve facility quality while maintaining or reducing facility cost. In addition, BIM creates opportunities for reusing data for multiple purposes, including operation and maintenance of Client’s facilities. During Construction phase of the project use of BIM results in acceleration of works on site and reduces engineering time. To achieve these ends, the BIM must be structured appropriately. This document describes requirements for use of Building Information Models (BIM) during construction phase of the project. 1.3. Tender submission requirements As part of tender submission Contractor must provide preliminary BIM Execution Plan (BEP) describing strategy approach to BIM on the project. The preliminary BEP shall include as a minimum the following: - Proposed IT Infrastructure; - Statement of Planned Project BIM Uses, including detailed interpretation of the contractual BIM use requirements, as well as any optional BIM uses the Contractor plans to utilize for their own benefit; - List of BIM models and disciplines; - BIM deliverables files and formats; - BIM Software for model production, coordination and other uses; - BIM Consultants and Sub-Contractors (if contractor is planning to outsource BIM works); - Detailed strategy statements, diagrams, tables, etc. to describe how planned BIM uses will be managed; - Project Org chart including BIM team; In addition, Contractor must describe its previous BIM experience and proposed Project BIM team, including names, job titles, description of responsibilities and contact information in order that the Project Manager and/or AOR (Architect of Record) may set up an interview. The proposal must also describe how its staff prior BIM experience relates to specific BIM deliverables and tasks within the Contractor’s scope of work or proposal. 1.4. IT infrastructure Contractor must have, or must obtain at its own cost, sufficient software licenses and computer hardware to adequately perform the services required. Contractor must provide software license Revit and Navisworks (Autodesk) for use of BIM Engineer (*****) on site. Hardware specification: - Multi-Core Intel® Xeon®, or i-Series processor or AMD® equivalent with SSE2 technology; - 16 GB RAM; - DirectX® 11 capable graphics card. The Contractor must maintain and administer the BIM and associated servers and provide secure access to project personnel including commissioning authority, facility managers and other personnel designated by the Employer during construction stage of the project.

تعليقات

المشاركات الشائعة